Categories: News

Vučić hopes that gas supplies from Azerbaijan will start in autumn 2023

BELGRADE, 1 Oct – PRIME. The launch of an interconnector (connecting gas pipeline) for gas supplies to Serbia from Azerbaijan through Bulgaria may occur in the fall of 2023, Serbian President Aleksandar Vucic said.

Serbia calls sale of Oil Industry of Serbia to Gazprom a mistake

The Serbian leader is present on Saturday at the opening of the interconnector between Greece and Bulgaria with a length of 182 kilometers. It stretches from the Greek city of Komotini to the Bulgarian Stara Zagora. The pipeline with a capacity of 3 billion cubic meters of gas per year with the possibility of increasing volumes up to 5 billion cubic meters is designed for gas from Azerbaijan within the framework of the Trans Adriatic Gas Pipeline (TAP) and the terminal for liquefied natural gas in Alexandroupoli.

Bulgarian President Rumen Radev, Greek Prime Minister Kyriakos Mitsotakis, Azerbaijani President Ilham Aliyev, Romanian Prime Minister Nicolae Chuca, and North Macedonian President Stevo Pendarovski are taking part in the event together with Vucic and European Commission President Ursula von der Leyen.

“Serbia’s interconnection with Bulgaria will be completed in a year, and I hope that at the same time of the year in 2023 (year – ed.) we will be able to hold such a big ceremony in our country. Why is this so important to us? The price is very important, not only volumes, this is one of the questions. I am also sure that we will have more difficult autumn and winter than the head of the European Commission, Ursula von der Leyen, just said, she must be an optimist, she is a very professional politician,” Vucic told the audience, broadcast led agency Tanyug.

Serbia announced the preservation of all gas projects with Russia

According to him, in the future, with the support of the EU, it is planned to build a connecting gas pipeline between Serbia and North Macedonia.

Serbian authorities have previously announced a planned purchase from Azerbaijan in 2023 through a connecting gas pipeline with Bulgaria in volumes of 1.4 billion cubic meters per year. The EU previously allocated 50 million euros in subsidies, and the European Investment Bank a loan of 25 million euros for the construction of the 109 km Nis-Dimitrovgrad interconnector on Serbian territory. In Serbia, laying began on February 1 this year.

Russia is now the only supplier of natural gas to Serbia. Under a two-year agreement with Gazprom, official Belgrade has provided about 2.2 billion cubic meters a year, or 62% of its annual gas needs, and plans to reserve about 700 million cubic meters of gas for the winter on its territory and in Hungary.

Miners Hashrate

Recent Posts

Mining RTX 3070 at NiceHash: Overclocking, tuning, profitability, consumption

Mining on RTX 3070. Overclocking, tuning, profitability, consumption: If you are interested in finding more…

6 months ago

Mining GTX 1660, 1660 Ti, 1660 Super: Overclocking, settings, consumption

Mining with GTX 1660, 1660 Ti, 1660 Super. Overclocking, settings, consumption, profitability, comparisons - If…

6 months ago

Mining RTX 2070 and 2070 Super: Overclocking, profitability, consumption

Mining with RTX 2070 and 2070 Super. Overclocking, profitability, consumption, comparison What the RTX 2070…

6 months ago

Mining with RTX 3060, 3060 Ti. Limitations, overclocking, settings, consumption

Mining with RTX 3060, 3060 Ti. Limitations, overclocking, settings, consumption, profitability, comparison Let's look at…

6 months ago

Alphacool Eisblock Aurora Acryl GPX-A Sapphire – test: 2.8 GHz++ are not an issue

Alphacool Eisblock Aurora Acryl GPX-A (2022) with Sapphire Radeon RX 6950 XT Nitro+ Pure in…

6 months ago

Corporate Crypto Strategies 4.0: Leading with Bitcoin Expertise

In the ever-evolving landscape of business strategy, Bitcoin has emerged as a pivotal asset. With…

6 months ago

This website uses cookies.


Notice: ob_end_flush(): failed to send buffer of zlib output compression (1) in /home/gamefeve/bitcoinminershashrate.com/wp-includes/functions.php on line 5420

Notice: ob_end_flush(): failed to send buffer of zlib output compression (1) in /home/gamefeve/bitcoinminershashrate.com/wp-includes/functions.php on line 5420